Æȷοì
Simon Thevenin
Simon Thevenin
IMT Atlantique
imt-atlantique.frÀÇ À̸ÞÀÏ È®ÀεÊ
Á¦¸ñ
Àοë
Àοë
¿¬µµ
Operations management issues in design and control of hybrid human-robot collaborative manufacturing systems: a survey
SE Hashemi-Petroodi, S Thevenin, S Kovalev, A Dolgui
Annual Reviews in Control 49, 264-276, 2020
952020
Workforce reconfiguration strategies in manufacturing systems: a state of the art
SE Hashemi-Petroodi, A Dolgui, S Kovalev, MY Kovalyov, S Thevenin
International Journal of Production Research 59 (22), 6721-6744, 2021
762021
Material Requirements Planning Under Demand Uncertainty Using Stochastic Optimization
S Thevenin, Y Adulyasak, JF Cordeau
Production and Operations Management, 2021
582021
Metaheuristics for a scheduling problem with rejection and tardiness penalties
S Thevenin, N Zufferey, M Widmer
Journal of scheduling 18, 89-105, 2015
462015
Sustainable and energy efficient reconfigurable manufacturing systems
O Battaïa, L Benyoucef, X Delorme, A Dolgui, S Thevenin
Reconfigurable Manufacturing Systems: From Design to Implementation, 179-191, 2020
432020
Learning variable neighborhood search for a scheduling problem with time windows and rejections
S Thevenin, N Zufferey
Discrete Applied Mathematics 261, 344-353, 2019
422019
Order acceptance and scheduling with earliness and tardiness penalties
S Thevenin, N Zufferey, M Widmer
Journal of Heuristics 22, 849-890, 2016
422016
The ASSISTANT project: AI for high level decisions in manufacturing
G Castañé, A Dolgui, N Kousi, B Meyers, S Thevenin, E Vyhmeister, ...
International Journal of Production Research 61 (7), 2288-2306, 2023
352023
Graph multi-coloring for a job scheduling application
S Thevenin, N Zufferey, JY Potvin
Discrete Applied Mathematics, 2016
352016
Makespan minimisation for a parallel machine scheduling problem with preemption and job incompatibility
S Thevenin, N Zufferey, JY Potvin
International Journal of Production Research 55 (6), 1588-1606, 2017
312017
Robust optimization approaches for purchase planning with supplier selection under lead time uncertainty
S Thevenin, O Ben-Ammar, N Brahimi
European Journal of Operational Research 303 (3), 1199-1215, 2022
262022
A state-of-the-art on production planning in Industry 4.0
D Luo, S Thevenin, A Dolgui
International Journal of Production Research 61 (19), 6602-6632, 2023
232023
Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times
I Slama, O Ben-Ammar, S Thevenin, A Dolgui, F Masmoudi
European Journal of Operational Research 303 (3), 1183-1198, 2022
162022
Stochastic dual dynamic programming for multiechelon lot sizing with component substitution
S Thevenin, Y Adulyasak, JF Cordeau
INFORMS Journal on Computing 34 (6), 3151-3169, 2022
152022
Workforce planning and assignment in mixed-model assembly lines as a factor of line reconfigurability: state of the art
A Dolgui, SEH Petroodi, S Kovalev, MY Kovalyov, S Thevenin
IFAC-PapersOnLine 52 (13), 2746-2751, 2019
152019
Model and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisions
S Thevenin, N Zufferey, R Glardon
Annals of Operations Research 259, 437-460, 2017
152017
Robust optimization for lot-sizing problems under yield uncertainty
P Metzker, S Thevenin, Y Adulyasak, A Dolgui
Computers & Operations Research 149, 106025, 2023
122023
Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers
SE Hashemi-Petroodi, S Thevenin, S Kovalev, A Dolgui
Omega 113, 102688, 2022
102022
A digital twin-driven methodology for material resource planning under uncertainties
D Luo, S Thevenin, A Dolgui
Advances in Production Management Systems. Artificial Intelligence for ¡¦, 2021
102021
A skill-and feature-based approach to planning process monitoring in assembly planning
C Gonnermann, SE Hashemi-Petroodi, S Thevenin, A Dolgui, R Daub
The International Journal of Advanced Manufacturing Technology 122 (5), 2645 ¡¦, 2022
92022
ÇöÀç ½Ã½ºÅÛÀÌ ÀÛµ¿µÇÁö ¾Ê½À´Ï´Ù. ³ªÁß¿¡ ´Ù½Ã ½ÃµµÇØ ÁÖ¼¼¿ä.
ÇмúÀÚ·á 1–20