Follow
Maksat Omarov
Title
Cited by
Cited by
Year
Causes of delay in residential construction projects in Cambodia
S Durdyev, M Omarov, S Ismail
Cogent Engineering 4 (1), 1291117, 2017
2012017
SWOT Analysis of the Cambodian construction industry within the ASEAN economic community
S Durdyev, M Omarov, S Ismail
Proceedings of the 28th IBIMA conference on Vision, 2020
192020
Liquefaction potential and post-liquefaction settlement of saturated clean sands: And effect of geofiber reinforcement
M Omarov
162010
Post-cyclic loading settlement of saturated clean sand
K Hazirbaba, M Omarow
Soil Dynamics and Earthquake Engineering 77, 337-347, 2015
122015
Strain-based assessment of liquefaction and seismic settlement of saturated sand
K Hazirbaba, M Omarow
Cogent Engineering 6 (1), 1573788, 2019
112019
Causes of delay in residential construction projects in Cambodia. Cogent Engineering, 4 (1), 1–12
S Durdyev, M Omarov, S Ismail
82017
Excess pore pressure generation and post-cyclic loading settlement of geofiber-reinforced sand
K Hazirbaba, M Omarow
Gradevinar 70 (1), 11-18, 2018
52018
Estimation of traffic delay due to U-turns at uncontrolled medians: case study in Phnom Penh, Cambodia
M Omarov, S Ismail, WNMWM Rani, S Durdyev
Sustainability 14 (1), 118, 2021
42021
Significant contributors to cost overruns in construction projects of Cambodia, Cogent Engineering 4 (1): 1–10
S Durdyev, M Omarov, S Ismail, M Lim
22017
The system can't perform the operation now. Try again later.
Articles 1–9