Follow
Enrique Gerstl
Enrique Gerstl
Verified email at mail.huji.ac.il
Title
Cited by
Cited by
Year
Scheduling problems with two competing agents to minimized weighted earliness–tardiness
E Gerstl, G Mosheiov
Computers & operations research 40 (1), 109-116, 2013
502013
Single machine scheduling problems with generalised due-dates and job-rejection
E Gerstl, G Mosheiov
International Journal of Production Research 55 (11), 3164-3172, 2017
352017
Scheduling on parallel identical machines with job-rejection and position-dependent processing times
E Gerstl, G Mosheiov
Information Processing Letters 112 (19), 743-747, 2012
332012
Single machine just‐in‐time scheduling problems with two competing agents
E Gerstl, G Mosheiov
Naval Research Logistics (NRL) 61 (1), 1-16, 2014
312014
Minmax scheduling with acceptable lead-times: Extensions to position-dependent processing times, due-window and job rejection
E Gerstl, B Mor, G Mosheiov
Computers & Operations Research 83, 150-156, 2017
292017
Scheduling on a proportionate flowshop to minimise total late work
E Gerstl, B Mor, G Mosheiov
International Journal of Production Research 57 (2), 531-543, 2019
232019
A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop
E Gerstl, B Mor, G Mosheiov
Information Processing Letters 115 (2), 159-162, 2015
202015
Due-window assignment with identical jobs on parallel uniform machines
E Gerstl, G Mosheiov
European Journal of Operational Research 229 (1), 41-47, 2013
172013
Single machine scheduling to maximize the number of on-time jobs with generalized due-dates
E Gerstl, G Mosheiov
Journal of Scheduling 23 (3), 289-299, 2020
162020
The optimal number of used machines in a two-stage flexible flowshop scheduling problem
E Gerstl, G Mosheiov
Journal of Scheduling 17, 199-210, 2014
162014
Semi-V-shape property for two-machine no-wait proportionate flow shop problem with TADC criterion
S Kovalev, MY Kovalyov, G Mosheiov, E Gerstl
International Journal of Production Research 57 (2), 560-566, 2019
152019
Due-window assignment problems with unit-time jobs
E Gerstl, G Mosheiov
Applied Mathematics and Computation 220, 487-495, 2013
152013
Batch scheduling in a two-stage flexible flow shop problem
E Gerstl, G Mosheiov, A Sarig
Foundations of Computing and Decision Sciences 39 (1), 3-16, 2014
142014
Minmax due-date assignment with a time window for acceptable lead-times
E Gerstl, G Mosheiov
Annals of Operations Research 211, 167-177, 2013
132013
A two-stage flow shop batch-scheduling problem with the option of using not-all-machines
E Gerstl, G Mosheiov
International Journal of Production Economics 146 (1), 161-166, 2013
112013
An improved algorithm for due-window assignment on parallel identical machines with unit-time jobs
E Gerstl, G Mosheiov
Information Processing Letters 113 (19-21), 754-759, 2013
102013
A two-stage flow shop scheduling with a critical machine and batch availability
E Gerstl, G Mosheiov
Foundations of Computing and Decision Sciences 37 (1), 39-56, 2012
102012
The single machine CON problem with unavailability period
E Gerstl, G Mosheiov
International Journal of Production Research 59 (3), 824-838, 2021
82021
Minmax weighted earliness-tardiness with identical processing times and two competing agents
E Gerstl, G Mosheiov
Computers & Industrial Engineering 107, 171-177, 2017
72017
Scheduling with a due-window for acceptable lead-times
E Gerstl, G Mosheiov
Journal of the Operational Research Society 66 (9), 1578-1588, 2015
72015
The system can't perform the operation now. Try again later.
Articles 1–20