An improved formulation of the underground mine scheduling optimization problem when considering selective mining SE Terblanche, A Bley ORiON 31 (1), 1-16, 2015 | 35 | 2015 |
Solving the passive optical network with fiber duct sharing planning problem using discrete techniques SP Van Loggerenberg, MJ Grobler, SE Terblanche Electronic Notes in Discrete Mathematics 41, 343-350, 2013 | 16 | 2013 |
Optimization of PON planning for FTTH deployment based on ccoverage SP Van Loggerenberg, MJ Grobler, SE Terblanche Southern Africa Telecommunication Networks and Applications Conference, 2-5 …, 2012 | 15 | 2012 |
Pairs trading on the johannesburg stock exchange HP Mashele, SE Terblanche, JH Venter Investment Analysts Journal 2013 (78), 13-26, 2013 | 12 | 2013 |
Survivable network design with demand uncertainty SE Terblanche, R Wessäly, JM Hattingh European Journal of Operational Research 210 (1), 10-26, 2011 | 12 | 2011 |
Contributions towards survivable network design with uncertain traffic requirements SE Terblanche North-West University, 2008 | 10 | 2008 |
Off-gas power generation optimisation using a mixed integer linear programming model PZ Venter, SE Terblanche, M van Eldik 44th Annual Conference of the Operations Research Society of South Africa, 81, 2015 | 8 | 2015 |
Turbine investment optimisation for energy recovery plants by utilising historic steam flow profiles P van Zyl Venter, SE Terblanche, M Van Eldik Energy 155, 668-677, 2018 | 6 | 2018 |
Improving power generation from fluctuating off-gas productions PZ Venter, SE Terblanche, M van Eldik 2015 International Conference on the Industrial and Commercial Use of Energy …, 2015 | 6 | 2015 |
Credit price optimisation within retail banking SE Terblanche, T De la Rey ORiON 30 (2), 85-102, 2014 | 6 | 2014 |
Solution strategies for the multi-hour network design problem SE Terblanche, R Wessäly, JM Hattingh Proc. of the INOC, Spa, Belgium, 2007 | 6 | 2007 |
Lagrangian relaxation as a solution approach to solving the survivable multi-hour network design problem SE Terblanche, R Wessäly, JM Hattingh Proc. of the South African Telecommuniations and Networks Applications …, 2007 | 5 | 2007 |
Linear response surface analysis as a technique for visualizing linear models and data SE Terblanche North-West University (South Africa), 2001 | 5 | 2001 |
A systematic literature review on stochastic programming models in the retail industry C Bisset, SE Terblanche South African Journal of Industrial Engineering 32 (3), 97-110, 2021 | 4 | 2021 |
Resource constrained project scheduling models and algorithms applied to underground mining SE Terblanche Stellenbosch: Stellenbosch University, 2017 | 4 | 2017 |
Heuristic approach to the passive optical network with fibre duct sharing planning problem SP Van Loggerenberg, MJ Grobler, SE Terblanche ORiON 31 (2), 95-110, 2015 | 4 | 2015 |
The use of different clustering algorithms and distortion functions in semi supervised segmentation DG Breed, T De La Rey, SE Terblanche Proceedings of the 42nd Operations Research Society of South Africa Annual …, 2013 | 4 | 2013 |
Benders decomposition of the resource constrained project scheduling problem SE Terblanche, JH van Vuuren | 3 | 2017 |
Implementing an optimisation model for turbine investment selection under fluctuating steam productions PZ Venter, SE Terblanche, M Van Eldik 2016 International Conference on the Industrial and Commercial Use of Energy …, 2016 | 3 | 2016 |
Utilising fluctuating off-gases more efficiently in a power co-generation environment through less flaring PZ Venter, SE Terblanche, M Van Eldik 2016 International Conference on the Industrial and Commercial Use of Energy …, 2016 | 3 | 2016 |