A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts A Elmi, M Solimanpur, S Topaloglu, A Elmi Computers & industrial engineering 61 (1), 171-178, 2011 | 137 | 2011 |
Combinatorial Benders cuts for assembly line balancing problems with setups S Akpinar, A Elmi, T Bektaş European Journal of Operational Research 259 (2), 527-537, 2017 | 76 | 2017 |
A tabu search approach for cell scheduling problem with makespan criterion M Solimanpur, A Elmi International journal of production economics 141 (2), 639-645, 2013 | 73 | 2013 |
A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots A Elmi, S Topaloglu Computers & operations research 40 (10), 2543-2555, 2013 | 67 | 2013 |
Multi-degree cyclic robotic flow shop cell scheduling problem: Ant colony optimization A Elmi, S Topaloglu Computers & Operations Research 73, 67–83, 2016 | 49* | 2016 |
Scheduling multiple parts in hybrid flow shop robotic cells served by a single robot A Elmi, S Topaloglu International Journal of Computer Integrated Manufacturing, 2014 | 46 | 2014 |
A tabu search approach for group scheduling in buffer-constrained flow shop cells M Solimanpur, A Elmi International Journal of Computer Integrated Manufacturing 24 (3), 257-268, 2011 | 37 | 2011 |
Cyclic job shop robotic cell scheduling problem: Ant colony optimization A Elmi, S Topaloglu Computers & industrial engineering 111, 417-432, 2017 | 36 | 2017 |
Multi-degree cyclic flow shop robotic cell scheduling problem with multiple robots A Elmi, S Topaloglu International Journal of Computer Integrated Manufacturing 30 (8), 805-821, 2017 | 19 | 2017 |
Distributed assembly permutation flow shop problem; Single seekers society algorithm A Hamzadayı, MA Arvas, A Elmi Journal of Manufacturing Systems 61, 613-631, 2021 | 17 | 2021 |
Exploiting a fleet of UAVs for monitoring and data acquisition of a distributed sensor network S MahmoudZadeh, A Yazdani, A Elmi, A Abbasi, P Ghanooni Neural Computing and Applications, 1-14, 2022 | 15 | 2022 |
An ant colony optimisation based heuristic for mixed-model assembly line balancing with setups D Thiruvady, A Nazari, A Elmi 2020 IEEE Congress on evolutionary computation (CEC), 1-8, 2020 | 9 | 2020 |
Cyclic flow shop robotic cell scheduling problem with multiple part types A Elmi, A Nazari, D Thiruvady, A Durmusoglu IEEE Transactions on Engineering Management 69 (6), 3240-3252, 2020 | 7 | 2020 |
A bender’s algorithm of decomposition used for the parallel machine problem of robotic cell MR Komari Alaei, M Soysal, A Elmi, A Banaitis, N Banaitiene, ... Mathematics 9 (15), 1730, 2021 | 6 | 2021 |
Simulated Annealing for Single and Mixed Model Assembly Line Balancing with Setups A Nazari, D Thiruvady, A Elmi, JG Schneider 2020 IEEE Symposium Series on Computational Intelligence (SSCI), 2762-2769, 2020 | 2 | 2020 |
Minimising Cycle Time in Assembly Lines: A Novel Ant Colony Optimisation Approach D Thiruvady, A Elmi, A Nazari, JG Schneider Australasian Joint Conference on Artificial Intelligence, 125-137, 2020 | 1 | 2020 |
PLANNING OF SHUTTLE BUS IN GAZIANTEP UNIVERSITY CAMPUS: A GIS APPROACH M ERBAŞ, E ÖZCEYLAN, C ÇETİNKAYA, A ELMİ LM-SCM 2016 XIV. INTERNATIONAL LOGISTICS AND SUPPLY CHAIN CONGRESS, 423, 2016 | 1 | 2016 |
Accelerated Benders Decomposition Algorithm for Sequence-Dependent Cost-Oriented Assembly Line Balancing Problem A Furugi, A Elmi, MJ Feizollahi Available at SSRN 4516178, 2023 | | 2023 |
Blocking Cyclic Job-Shop Scheduling Problems A Elmi, DR Thiruvady, AT Ernst Algorithms 15 (10), 375, 2022 | | 2022 |
A Bender's Algorithm of Decomposition Used for the Parallel MRK Alaei, M Soysal, A Elmi, A Banaitis, N Banaitiene | | 2021 |