Follow
Seongdeok Bang
Seongdeok Bang
AiV, Company, Yonsei University
Verified email at yonsei.ac.kr
Title
Cited by
Cited by
Year
Encoder–decoder network for pixel‐level road crack detection in black‐box images
S Bang, S Park, H Kim, H Kim
Computer‐Aided Civil and Infrastructure Engineering 34 (8), 713-727, 2019
3822019
Patch-based crack detection in black box images using convolutional neural networks
S Park, S Bang, H Kim, H Kim
Journal of Computing in Civil Engineering 33 (3), 04019017, 2019
1272019
UAV-based automatic generation of high-resolution panorama at a construction site with a focus on preprocessing for image stitching
S Bang, H Kim, H Kim
Automation in construction 84, 70-80, 2017
1132017
Analyzing context and productivity of tunnel earthmoving processes using imaging and simulation
H Kim, S Bang, H Jeong, Y Ham, H Kim
Automation in Construction 92, 188-198, 2018
942018
Image augmentation to improve construction resource detection using generative adversarial networks, cut-and-paste, and image transformation techniques
S Bang, F Baek, S Park, W Kim, H Kim
Automation in Construction 115, 103198, 2020
732020
Context-based information generation for managing UAV-acquired data using image captioning
S Bang, H Kim
Automation in Construction 112, 103116, 2020
472020
A deep residual network with transfer learning for pixel-level road crack detection
S Bang, S Park, H Kim, H Kim
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2018
342018
Question answering method for infrastructure damage information retrieval from textual data using bidirectional encoder representations from transformers
Y Kim, S Bang, J Sohn, H Kim
Automation in construction 134, 104061, 2022
312022
Real options-based framework for hydropower plant adaptation to climate change
K Kim, T Park, S Bang, H Kim
Journal of management in engineering 33 (3), 04016049, 2017
302017
Msanet: Multi-similarity and attention guidance for boosting few-shot segmentation
E Iqbal, S Safarov, S Bang
arXiv preprint arXiv:2206.09667, 2022
272022
Proactive proximity monitoring with instance segmentation and unmanned aerial vehicle‐acquired video‐frame prediction
S Bang, Y Hong, H Kim
Computer‐Aided Civil and Infrastructure Engineering 36 (6), 800-816, 2021
272021
Investment timing decisions in hydropower adaptation projects using climate scenarios: A case study of South Korea
K Kim, H Jeong, S Ha, S Bang, DH Bae, H Kim
Journal of Cleaner Production 142, 1827-1836, 2017
192017
Vision-based 2D map generation for monitoring construction sites using UAV Videos
S Bang, H Kim, H Kim
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2017
182017
Patch-based crack detection in black box road images using deep learning
S Park, S Bang, H Kim, H Kim
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2018
102018
An image augmentation method for detecting construction resources using convolutional neural network and UAV images
S Bang, F Baek, S Park, W Kim, H Kim
Proceedings of the 36th International Symposium on Automation and Robotics …, 2019
62019
Research of actual condition and mitigation plan for aging workers' health and safety at construction sites
P Kim, S Bang, K Kim, H Kim
Korean Journal of Construction Engineering and Management 18 (1), 37-47, 2017
62017
Integration of imaging and simulation for earthmoving productivity analysis
H Kim, S Bang, H Jeong, Y Ham, H Kim
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2018
22018
Critical success factors for nuclear power plant construction projects
G Shin, S Bang, K Kim, H Kim
Korean Journal of Construction Engineering and Management 18 (1), 48-57, 2017
22017
Deep learning-based question answering system for proactive disaster management
Y Kim, J Sohn, S Bang, H Kim
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2020
12020
Identifying Key Financial Variables Predicting the Financial Performance of Construction Companies
W Seo, B Kim, S Bang, Y Kang
Journal of Construction Engineering and Management 150 (3), 04024007, 2024
2024
The system can't perform the operation now. Try again later.
Articles 1–20