Linear models for stockpiling in open-pit mine production scheduling problems
E Moreno, M Rezakhah, A Newman, F Ferreira
European Journal of Operational Research 260 (1), 212-221, 2017
692017
Artificial neural network and firefly algorithm for estimation and minimization of ground vibration induced by blasting in a mine
P Bayat, M Monjezi, M Rezakhah, DJ Armaghani
Natural Resources Research 29, 4121-4132, 2020
372020
Practical performance of an open pit mine scheduling model considering blending and stockpiling
M Rezakhah, E Moreno, A Newman
Computers & Operations Research 115, 104638, 2020
332020
Open pit mine planning with degradation due to stockpiling
M Rezakhah, A Newman
Computers & Operations Research 115, 104589, 2020
242020
Application of XGB-based metaheuristic techniques for prediction time-to-failure of mining machinery
MMK Kazemi, Z Nabavi, M Rezakhah, A Masoudi
Systems and Soft Computing 5, 200061, 2023
22023
Open pit mine scheduling model considering blending and stockpiling
M Rezakhah, E Moreno
International Symposium on Mine Planning & Equipment Selection, 75-82, 2019
22019
Linear programming approximations for modeling instant-mixing stockpiles
E Moreno, F Ferreira, M Goycoolea, D Espinoza, A Newman, M Rezakhah
Application of computers and operations research in the mineral industry …, 2015
22015
Open pit mine planning with stockpiling
M Rezakhah
Colorado School of Mines, 2017
12017
Design of stable pit slopes of Sungun Copper Mine
M Monjezi, M Rezakhah
IRANIAN JOURNAL OF MINING ENGINEERING (IRJME) 2 (3), 41-49, 2007
12007
New MIP model for short-term planning in open-pit mines considering loading machine performance: a case study in Iran
M Mirzehi, M Rezakhah, A Mousavi, Z Nabavi
International Journal of Mining and Mineral Engineering 14 (4), 341-364, 2023
2023
Design of stable slopes for Songun copper mine
M Monjezi, K Goshtasbi, M Rezakhah, TN Singh
Mining Technology 116 (3), 146-152, 2007
2007
A MATHEMATICAL EQUATION FOR DETERMINATION OF PIT SLOPE OF SONGUN COPPER MINE
M MONJEZI, K GOSHTASBI, M REZAKHAH
2006
DESIGN OF OPTIMUM OVERALL SLOPE OF SONGUN COPPER MINE
M MONJEZI, M HEYDARI, M REZAKHAH, A TORABI
2005