Follow
Mohammad Rostami
Mohammad Rostami
Verified email at shahroodut.ac.ir
Title
Cited by
Cited by
Year
The two stage assembly flow-shop scheduling problem with batching and delivery
H Kazemi, MM Mazdeh, M Rostami
Engineering Applications of Artificial Intelligence 63, 98-107, 2017
802017
Multi-objective parallel machine scheduling problem with job deterioration and learning effect under fuzzy environment
M Rostami, AE Pilerood, MM Mazdeh
Computers & Industrial Engineering 85, 206-215, 2015
642015
Minimizing maximum tardiness and delivery costs with batch delivery and job release times
M Rostami, O Kheirandish, N Ansari
Applied Mathematical Modelling 39 (16), 4909-4927, 2015
442015
A branch-and-bound algorithm for two-machine flow-shop scheduling problems with batch delivery costs
MM Mazdeh, M Rostami
International Journal of Systems Science: Operations & Logistics 1 (2), 94-104, 2014
372014
A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems
M Rostami, M Bagherpour
Operational Research 20, 857-897, 2020
302020
A multi-objective robust optimization model for the capacitated P-hub location problem under uncertainty
A Makui, M Rostami, E Jahani, A Nikui
Management Science Letters 2 (2), 525-534, 2002
302002
Minimizing maximum tardiness and delivery costs in a batched delivery system
MM Mazdeh, M Rostami, MH Namaki
Computers & Industrial Engineering 66 (4), 675-682, 2013
272013
The integrated production-distribution scheduling in parallel machine environment by using improved genetic algorithms
H Kazemi, M Mahdavi Mazdeh, M Rostami, M Heydari
Journal of Industrial and Production Engineering 38 (3), 157-170, 2021
242021
Improved and competitive algorithms for large scale multiple resource-constrained project-scheduling problems
M Rostami, D Moradinezhad, A Soufipour
KSCE Journal of Civil Engineering 18, 1261-1269, 2014
232014
Minimizing total weighted completion and batch delivery times with machine deterioration and learning effect: a case study from wax production
M Rostami, S Nikravesh, M Shahin
Operational Research 20, 1255-1287, 2020
182020
Resource pool location for periodic services in decentralized multi-project scheduling problems
M Rostami, M Bagherpour, MM Mazdeh, A Makui
Journal of Computing in Civil Engineering 31 (5), 04017022, 2017
172017
Assembly flow shop scheduling problem considering machine eligibility restrictions and auxiliary resource constraints
SMH Hosseini, SS Sana, M Rostami
International journal of systems science: operations & logistics 9 (4), 512-528, 2022
142022
A new improved genetic algorithm approach and a competitive heuristic method for large-scale multiple resource-constrained project-scheduling problems
M Khanzadi, R Soufipour, M Rostami
International Journal of Industrial Engineering Computations 2 (4), 737-748, 2011
122011
A gamified teaching–learning based optimization algorithm for a three-echelon supply chain scheduling problem in a two-stage assembly flow shop environment
M Rostami, A Yousefzadeh
Applied Soft Computing 146, 110598, 2023
62023
Minimizing maximum tardiness subject to collect the EOL products in a single machine scheduling problem with capacitated batch delivery and pickup systems
M Rostami
Computers & Industrial Engineering 161, 107634, 2021
52021
A multi-objective decentralized multiple construction projects scheduling problem considering periodic services and ordering policies
M Rostami, M Bagherpour, MH Hosseini
Iran University of Science & Technology 11 (2), 195-230, 2021
52021
A stochastic capacitated p-hub location problem: A case study of iran
M Rostami, E Farahani, D Moradinezhad
Journal of American Science 8 (11), 620-628, 2012
52012
Optimization of green hybrid flow shop scheduling problem with considering batch delivery system
M Rostami, A Sabripour
Modern research in decision making 7 (4), 126-155, 2022
42022
Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect
A Jabarzadeh, M Rostami, M Shahin, K Shahanaghi
Journal of Industrial and Systems Engineering 10 (3), 16-32, 2017
42017
An Optimization Model for Closed-Loop Supply Chain Scheduling Problem
M Rostami
Journal of Industrial Management Perspective 10 (3), 29-52, 2020
32020
The system can't perform the operation now. Try again later.
Articles 1–20