Follow
闫斌
闫斌
Verified email at csu.edu.cn
Title
Cited by
Cited by
Year
Recent development of design and construction of short span high-speed railway bridges in China
B Yan, GL Dai, N Hu
Engineering Structures 100, 707-717, 2015
1472015
Recent development of design and construction of medium and long span high-speed railway bridges in China
N Hu, GL Dai, B Yan, K Liu
Engineering Structures 74, 233-241, 2014
1452014
Elastic-plastic seismic response of CRTS II slab ballastless track system on high-speed railway bridges
B Yan, S Liu, H Pu, GL Dai, XP Cai
Science China Technological Sciences 60, 865-871, 2017
682017
Beam-track interaction of high-speed railway bridge with ballast track
B Yan, G Dai, H Zhang
Journal of Central South University 19 (5), 1447-1453, 2012
642012
Experimental study on bridge—track system temperature actions for Chinese high-speed railway
P Lou, J Zhu, G Dai, B Yan
Archives of Civil and Mechanical Engineering 18, 451-464, 2018
462018
Longitudinal forces of continuously welded track on high-speed railway cable-stayed bridge considering impact of adjacent bridges
G Dai, B Yan
Journal of Central South University 19 (8), 2348-2353, 2012
432012
Seismic pounding and protection measures of simply-supported beams considering interaction between continuously welded rail and bridge
B Yan, G Dai
Structural Engineering International 23 (1), 61-67, 2013
422013
高速铁路斜拉桥上无缝线路纵向力研究
闫斌, 戴公连
铁道学报 34 (3), 83-87, 2012
342012
Research on the fatigue performance of self-compacting concrete structure in CRTSIII slab ballastless track under the action of heavy haul train
Z Zeng, X Huang, B Yan, W Wang, AA Shuaibu, X He
Construction and Building Materials 303, 124465, 2021
332021
Longitudinal force in continuously welded rail on long-span tied arch continuous bridge carrying multiple tracks
B Yan, G Dai, W Guo, Q Xu
Journal of Central South University 22 (5), 2001-2006, 2015
302015
考虑加载历史的高速铁路梁轨相互作用分析
闫斌, 戴公连
铁道学报 36 (6), 75-80, 2014
232014
Influence of slab length on dynamic characteristics of subway train-steel spring floating slab track-tunnel coupled system
Q Xu, B Yan, P Lou, X Zhou
Latin American Journal of Solids and Structures 12, 649-674, 2015
192015
Study on vibration reduction slab track and adjacent transition section in high-speed railway tunnel
Q Xu, X Chen, B Yan, W Guo
Journal of Vibroengineering 17 (2), 905-916, 2015
182015
高速铁路斜拉桥与无缝线路相互作用研究
戴公连, 闫斌
土木工程学报 46 (8), 90-97, 2013
152013
客运专线斜拉桥梁轨相互作用设计参数
闫斌, 戴公连, 董林育
交通运输工程学报 12 (1), 31-37, 2012
142012
Analysis of interaction between continuously-welded rail and high-speed railway bridges considering loading-history
B Yan, GL Dai
Journal of the China Railway Society 36 (6), 75-80, 2014
132014
Investigation and countermeasures of ship-bridge collision accidents in China in recent years
B Yan, GL Dai
Advanced Materials Research 168, 167-174, 2011
122011
Longitudinal force of continuously welded rail on suspension bridge with length exceeding 1000 m
B Yan, G Zhang, Z Han, P Lou
Structural Engineering International 29 (3), 390-395, 2019
112019
我国典型地区无砟轨道非线性温度梯度及温度荷载模式
闫斌, 刘施, 戴公连, 蒲浩
铁道学报 38 (8), 81-86, 2016
112016
Case study of twin cable-stayed bridges for high-speed railway in China: Design, analysis and construction
G Dai, M Su, B Yan
Structural Engineering International 24 (3), 396-401, 2014
112014
The system can't perform the operation now. Try again later.
Articles 1–20