Implementation of cyber-physical production systems for quality prediction and operation control in metal casting JH Lee, SD Noh, HJ Kim, YS Kang Sensors 18 (5), 1428, 2018 | 138 | 2018 |
Digital twin-based cyber physical production system architectural framework for personalized production KT Park, J Lee, HJ Kim, SD Noh The International Journal of Advanced Manufacturing Technology 106, 1787-1810, 2020 | 123 | 2020 |
Scheduling cluster tools with ready time constraints for consecutive small lots HJ Kim, JH Lee, C Jung, TE Lee IEEE Transactions on Automation Science and Engineering 10 (1), 145-159, 2012 | 100 | 2012 |
Noncyclic scheduling of cluster tools with a branch and bound algorithm HJ Kim, JH Lee, TE Lee IEEE Transactions on Automation Science and Engineering 12 (2), 690-700, 2013 | 99 | 2013 |
A branch and bound algorithm for cyclic scheduling of timed Petri nets C Jung, HJ Kim, TE Lee IEEE Transactions on Automation Science and Engineering 12 (1), 309-323, 2013 | 65 | 2013 |
Scheduling cluster tools for concurrent processing of two wafer types JH Lee, HJ Kim, TE Lee IEEE Transactions on Automation Science and Engineering 11 (2), 525-536, 2014 | 63 | 2014 |
Scheduling lot switching operations for cluster tools JH Lee, HJ Kim, TE Lee IEEE Transactions on Semiconductor Manufacturing 26 (4), 592-601, 2013 | 60 | 2013 |
Scheduling single-armed cluster tools with chamber cleaning operations TS Yu, HJ Kim, TE Lee IEEE Transactions on Automation Science and Engineering 15 (2), 705-716, 2017 | 38 | 2017 |
Optimal scheduling of transient cycles for single-armed cluster tools with parallel chambers DK Kim, TE Lee, HJ Kim IEEE Transactions on Automation Science and Engineering 13 (2), 1165-1175, 2015 | 38 | 2015 |
Time-feasible reachability tree for noncyclic scheduling of timed Petri nets HJ Kim, JH Lee, TE Lee IEEE Transactions on Automation Science and Engineering 12 (3), 1007-1016, 2014 | 37 | 2014 |
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing JH Lee, HJ Kim, TE Lee International Journal of Production Research 53 (19), 6007-6022, 2015 | 36 | 2015 |
Reinforcement learning for robotic flow shop scheduling with processing time variations JH Lee, HJ Kim International Journal of Production Research 60 (7), 2346-2368, 2022 | 33 | 2022 |
Scheduling dual-armed cluster tools with cleaning processes H Kim, HJ Kim, JH Lee, TE Lee International Journal of Production Research 51 (12), 3671-3687, 2013 | 32 | 2013 |
Schedulability analysis for noncyclic operation of time-constrained cluster tools with time variation HJ Kim, JH Lee, TE Lee IEEE Transactions on Automation Science and Engineering 13 (3), 1409-1414, 2016 | 30 | 2016 |
Makespan analysis of lot switching period in cluster tools JH Lee, HJ Kim IEEE Transactions on Semiconductor Manufacturing 29 (2), 127-136, 2016 | 30 | 2016 |
Non-cyclic scheduling of a wet station HJ Kim, JH Lee, TE Lee IEEE Transactions on Automation Science and Engineering 11 (4), 1262-1274, 2013 | 27 | 2013 |
Scheduling transient periods of dual-armed cluster tools JH Lee, HJ Kim, TE Lee 2012 IEEE International Conference on Mechatronics and Automation, 1569-1574, 2012 | 27 | 2012 |
Semiconductor manufacturing automation TE Lee, HJ Kim, TS Yu Springer Handbook of Automation, 841-863, 2023 | 24 | 2023 |
Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times J Kim, HJ Kim International Journal of Production Research 59 (18), 5438-5453, 2021 | 24 | 2021 |
Bounds for parallel machine scheduling with predefined parts of jobs and setup time HJ Kim Annals of Operations Research 261 (1-2), 401-412, 2018 | 24 | 2018 |