Neural network model incorporating a genetic algorithm in estimating construction costs GH Kim, JE Yoon, SH An, HH Cho, KI Kang Building and Environment 39 (11), 1333-1340, 2004 | 189 | 2004 |
Development of a mobile safety monitoring system for construction sites UK Lee, JH Kim, H Cho, KI Kang Automation in Construction 18 (3), 258-264, 2009 | 171 | 2009 |
Experimental study on the shear strength of recycled aggregate concrete beams HB Choi, CK Yi, HH Cho, KI Kang Magazine of Concrete Research 62 (2), 103-114, 2010 | 134 | 2010 |
A laser-technology-based lifting-path tracking system for a robotic tower crane G Lee, HH Kim, CJ Lee, SI Ham, SH Yun, H Cho, BK Kim, GT Kim, K Kim Automation in Construction 18 (7), 865-874, 2009 | 118 | 2009 |
Application of support vector machines in assessing conceptual cost estimates SH An, UY Park, KI Kang, MY Cho, HH Cho Journal of Computing in Civil Engineering 21 (4), 259-264, 2007 | 105 | 2007 |
Improving tower crane productivity using wireless technology UK Lee, KI Kang, GH Kim, HH Cho Computer‐Aided Civil and Infrastructure Engineering 21 (8), 594-604, 2006 | 91 | 2006 |
Dynamic production scheduling model under due date uncertainty in precast concrete construction T Kim, Y Kim, H Cho Journal of Cleaner Production 257, 120527, 2020 | 83 | 2020 |
Statistical analysis of embodied carbon emission for building construction G Kang, T Kim, YW Kim, H Cho, KI Kang Energy and buildings 105, 326-333, 2015 | 74 | 2015 |
Application of information technology for mass customization in the housing construction industry in Korea Y Shin, SH An, HH Cho, GH Kim, KI Kang Automation in Construction 17 (7), 831-838, 2008 | 74 | 2008 |
A formwork method selection model based on boosted decision trees in tall building construction Y Shin, T Kim, H Cho, KI Kang Automation in Construction 23, 47-54, 2012 | 70 | 2012 |
Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction Y Shin, H Cho, KI Kang Automation in construction 20 (5), 550-558, 2011 | 53 | 2011 |
An experience curve-based decision support model for prioritizing restoration needs of cultural heritage CJ Kim, WS Yoo, UK Lee, KJ Song, KI Kang, H Cho Journal of Cultural Heritage 11 (4), 430-437, 2010 | 51 | 2010 |
Trends in 3D printing technology for construction automation using text mining D Lee, H Kim, J Sim, D Lee, H Cho, D Hong International Journal of Precision Engineering and Manufacturing 20, 871-882, 2019 | 45 | 2019 |
Patent analysis for forecasting promising technology in high-rise building construction HP Cho, H Lim, D Lee, H Cho, KI Kang Technological Forecasting and Social Change 128, 144-153, 2018 | 45 | 2018 |
Advanced formwork method integrated with a layout planning model for tall building construction T Kim, H Lim, UK Lee, M Cha, H Cho, KI Kang Canadian Journal of Civil Engineering 39 (11), 1173-1183, 2012 | 41 | 2012 |
Advanced planning model of formwork layout for productivity improvement in high-rise building construction D Lee, H Lim, T Kim, H Cho, KI Kang Automation in Construction 85, 232-240, 2018 | 34 | 2018 |
Genetic algorithm-based steel erection planning model for a construction automation system WS Yoo, HJ Lee, DI Kim, KI Kang, H Cho Automation in Construction 24, 30-39, 2012 | 32 | 2012 |
Application of AdaBoost to the retaining wall method selection in construction Y Shin, DW Kim, JY Kim, KI Kang, MY Cho, HH Cho Journal of Computing in Civil Engineering 23 (3), 188-192, 2009 | 30 | 2009 |
Improved productivity using a modified table formwork system for high-rise building in Korea GH Kim, SH An, HH Cho, DS Seo, KI Kang Building and environment 40 (11), 1472-1478, 2005 | 27 | 2005 |
Customer earned value: Performance indicator from flow and value generation view T Kim, YW Kim, H Cho Journal of management in engineering 32 (1), 04015017, 2016 | 25 | 2016 |