An efficient tabu algorithm for the single row facility layout problem H Samarghandi, K Eshghi European Journal of Operational Research 205 (1), 98-105, 2010 | 172 | 2010 |
A particle swarm optimization for the single row facility layout problem H Samarghandi, P Taabayan, FF Jahantigh Computers & Industrial Engineering 58 (4), 529-534, 2010 | 166 | 2010 |
Studying the reasons for delay and cost overrun in construction projects: The case of Iran H Samarghandi, SMM Tabatabaei, P Taabayan, A Mirhashemi, ... Journal of Construction in Developing Countries 21 (1), 51-84, 2016 | 123 | 2016 |
Take-back regulation: Remanufacturing or Eco-design? M Pazoki, H Samarghandi International Journal of Production Economics 227, 107674, 2020 | 65 | 2020 |
A meta-heuristic approach for solving the no-wait flow-shop problem H Samarghandi, TY ElMekkawy International Journal of Production Research 50 (24), 7313-7326, 2012 | 55 | 2012 |
On the exact solution of the no-wait flow shop problem with due date constraints H Samarghandi, M Behroozi Computers & Operations Research 81, 141-159, 2017 | 46 | 2017 |
A particle swarm optimisation for the no-wait flow shop problem with due date constraints H Samarghandi International Journal of Production Research 53 (9), 2853-2870, 2015 | 38 | 2015 |
Solving the no-wait flow-shop problem with sequence-dependent set-up times H Samarghandi, TY ElMekkawy International Journal of Computer Integrated Manufacturing 27 (3), 213-228, 2014 | 33 | 2014 |
A genetic algorithm and particle swarm optimization for no-wait flow shop problem with separable setup times and makespan criterion H Samarghandi, TY ElMekkawy The International Journal of Advanced Manufacturing Technology 61, 1101-1114, 2012 | 30 | 2012 |
Metaheuristics for fuzzy dynamic facility layout problem with unequal area constraints and closeness ratings H Samarghandi, P Taabayan, M Behroozi The International Journal of Advanced Manufacturing Technology 67 (9-12 …, 2013 | 26 | 2013 |
An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server H Samarghandi, TY ElMekkawy European Journal of Industrial Engineering 5 (2), 111-131, 2011 | 25 | 2011 |
A three-player game theory model for carbon cap-and-trade mechanism with stochastic parameters H Mirzaee, H Samarghandi, K Willoughby Computers & Industrial Engineering 169, 108285, 2022 | 24 | 2022 |
Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach H Samarghandi Computers & Industrial Engineering 136, 635-662, 2019 | 24 | 2019 |
Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times H Samarghandi International Journal of Production Research 53 (9), 2652-2673, 2015 | 19 | 2015 |
Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints H Samarghandi Computers & Industrial Engineering 136, 614-634, 2019 | 17 | 2019 |
Studying the effect of different combinations of timetabling with sequencing algorithms to solve the no-wait job shop scheduling problem H Samarghandi, TY ElMekkawy, AMM Ibrahem International Journal of Production Research 51 (16), 4942-4965, 2013 | 15 | 2013 |
A robust optimization model for green supplier selection and order allocation in a closed-loop supply chain considering cap-and-trade mechanism H Mirzaee, H Samarghandi, K Willoughby Expert Systems with Applications 228, 120423, 2023 | 12 | 2023 |
Two-machine, no-wait job shop problem with separable setup times and single-server constraints H Samarghandi, TY ElMekkawy The International Journal of Advanced Manufacturing Technology 65, 295-308, 2013 | 12 | 2013 |
Word-Of-Mouth and estimating demand based on network structure and epidemic models M Pazoki, H Samarghandi European Journal of Operational Research 291 (1), 323-334, 2021 | 9 | 2021 |
An Enumeration Algorithm for the No-Wait Flow Shop Problem with Due Date Constraints H Samarghandi, M Behroozi IFAC-PapersOnLine 49 (12), 1803-1808, 2016 | 9 | 2016 |